Growing population and hydraulic load
Retrofit of the existing biological tanks with MBBR media
The plant now carries the higher load within the original site boundary, without a second civil works programme.Because commissioning was staged, the town stayed on treatment throughout the upgrade.



Project Overview
The wastewater plant serving Kehridia in Tunisia needed more capacity as the town grew, while the existing civil structures were still serviceable. The brief was to expand treatment capacity inside the existing footprint and bring the outlet back inside the national standard.
Expansion inside an operating plant has to be staged: the old line keeps treating while the new process volume is commissioned, otherwise the town discharges raw sewage during construction.
Client Requirements & Key Challenges
- Growing population and hydraulic load
- Aging aeration and biological equipment
- No space for a second, parallel treatment line
Piniou Solution
- Retrofit of the existing biological tanks with MBBR media
- New aeration and mixing equipment inside the current basins
- Staged commissioning so the plant keeps treating during works
Products Used & Technical Highlights
| Country | Tunisia |
|---|---|
| Industry | Municipal |
| Scope | Process upgrade and capacity expansion |
| Process | MBBR retrofit in existing tanks |
Project Photos / Video

Result
The plant now carries the higher load within the original site boundary, without a second civil works programme.
Because commissioning was staged, the town stayed on treatment throughout the upgrade.