
No municipal sewer within reach of the guesthouses
Small-scale MBBR package plants, one per cluster
Each cluster now treats its own sewage close to the source, so nothing is discharged untreated onto farmland.Seasonal flow is handled by modular plants that can be taken offline in…



Project Overview
In rural Andalusia guesthouses and small hotels are spread across the countryside where the municipal sewer network does not reach. Untreated domestic sewage was discharged on site, polluting farmland and shallow groundwater. The project builds a cluster of small distributed plants instead of one long sewer.
Distributed treatment suits a scattered load: each plant is sized to its own cluster, so sewage does not sit in a long rising main and the treated water can be reused for irrigation locally.
Client Requirements & Key Challenges
- No municipal sewer within reach of the guesthouses
- Scattered, seasonal flow from tourism
- Sensitive farmland and shallow groundwater
Piniou Solution
- Small-scale MBBR package plants, one per cluster
- UV disinfection before discharge or reuse
- Ecological infiltration as the final polishing step
Products Used & Technical Highlights
| Country | Spain |
|---|---|
| Industry | Rural hospitality |
| Capacity | 80-150 m3/d per plant, 900 m3/d in total |
| Process | MBBR + UV + ecological infiltration |
Project Photos / Video

Result
Each cluster now treats its own sewage close to the source, so nothing is discharged untreated onto farmland.
Seasonal flow is handled by modular plants that can be taken offline in the low season without disturbing the rest of the cluster.