Nitrogen and phosphorus above the discharge consent
Renovation of the existing tanks and repartition of the zones
Re-partitioning the existing tanks brought nutrient removal inside the consent without building new basins.The filtration stage gives the plant headroom for any later tightening of the river quality standard.



Project Overview
Small and medium towns around Santiago were running outdated wastewater plants with poor nitrogen and phosphorus removal. Effluent exceeded its consent and polluted the rivers downstream, so the plants needed a process upgrade rather than more tank volume.
Nitrogen and phosphorus removal depends on the sequence of anoxic and aerobic zones. If the existing tanks are re-partitioned correctly, a conventional plant can meet nutrient limits without new civil structures.
Client Requirements & Key Challenges
- Nitrogen and phosphorus above the discharge consent
- Outdated process configuration in existing tanks
- Receiving river sensitive to nutrient load
Piniou Solution
- Renovation of the existing tanks and repartition of the zones
- Improved AAO process for nitrogen and phosphorus removal
- Advanced filtration as a final polishing stage
Products Used & Technical Highlights
| Country | Chile |
|---|---|
| Industry | Municipal |
| Capacity | 1,800 m3/d |
| Process | AAO upgrade + advanced filtration |
Project Photos / Video

Result
Re-partitioning the existing tanks brought nutrient removal inside the consent without building new basins.
The filtration stage gives the plant headroom for any later tightening of the river quality standard.